APPENDIX I
(See Paragraph-6)
FORM 1M
Note : If space provided against any parameter is inadequate,Kindly upload supporting document under 'Additional Attachments if any'  at the last part of the Form 1M. Please note that all such Annexures must be part of single pdf document.
(I)Basic Informations
S.No.Item Details
(i).Name of the Mining Lease site Maharo Stone Mines
(ii).Location / site (GPS Co-ordinate) 1. 24°43’11.1”N 87°45’55.7”E 2. 24°43’14.8”N 87°45’56.6”E 3. 24°43’12.6”N 87°46’02.3”E 4. 24°43’09.5”N 87°46’01.1”E
Annexure-GPS file      
(iii).
Type of LeaseIndivisual Area
Size of the Mining Lease (in ha.)2.69 ha.
(iv).Capacity of the Mining Lease (TPA) 39556
(v).Period of Mining Lease 10
(vi).Expected cost of the Project 5
(vii).
Have you hired Consultant/Registered Qualified Person(RQP) for preparing document?Yes
Accreditation No.NABET/EIA/1617/RA0044 
Name of Consultant/RQPPECS
Address DHANTOLI, NAGPUR
Mobile No.8407804251
Landline No.2413284
Email Idrch.jainsc58@gmail.com
(II) Environmental Sensitivity
S.No Areas Distance in kilometer / Details
1. (i).  Nearest rail or road bridge over the concerned river,rivulet,nallah etc. in kms.  5 km
2. (ii). Nearest Infrastructural along with distance in kms  0 km
(iii). Nearest Railway Line along with distance in kms  12 km
(iv). Nearest National Highway along with distance in kms  5 km
(v). Nearest State Highway along with distance in kms  10 km
(vi). Nearest Major District Road along with distance in kms 3 km
(vii). Nearest Any Other Road along with distance in kms  1 km
(viii). Nearest Electric transmission line pole or tower distance in kms  5 km
(ix). Nearest Canal or check dam or reservoirs or lake or ponds distance in kms  5 km
(x). Nearest In-take for drinking water pump house distance in kms  5 km
(xi). Nearest In-take for Irrigation canal pumps distance in kms  5 km
3. Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
No such area exists near the mining site.
4. Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests No such area exists near the mining site which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests - within One kilometres Radius.
5. Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration No such area within one kilometres radius.
6. Inland, coastal, marine or underground waters No such water exists near the Crusher site.
7. State, National boundaries State Boundary: None, within a radius of 5 Km.
8. Routes or facilities used by the public for access to recreation or other tourist,pilgrim areas No such routes or facilities used by the public for access to recreation or other tourist, pilgrim areas within three kilometres radius
9. Defence installations NONE
10. Densely populated or built-up area, distance from nearest human habitation Pakur:12 km N
11. Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship,community facilities) 1. Hospital:~5km 2. School:~5km 3. Temple: None 4. Panchayatghar: Hiranpur
12. Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) No such area containing important, high quality or scarce resources (Ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) within 500 metres.
13. Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) NONE
14. Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) Low probability of earthquake as the area falls in Seismic Zone II. No landslides or extreme or adverse climatic conditions have been observed in the recent years.
15.
Is proposed mining site located over or near fissure/fracture for ground water recharge?No
16.
Whether the proposal involves approval or clearance under the following Regulations or Acts namely?
(a).
The Forest (Conservation) Act,1980?No
(b).
The Wildlife (Protection) Act,1972?No
(c).
The Coastal Regulation Zone (C.R.Z) notification,2011?No
17.
Is forest land involved (ha)?No
18.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
19.
New/Expansion/ModernizationNew
Proposal NumberDIA/JH/MIN/17430/2018
File Number13/DEIAA DATED-18.09.2018
Date of Apply EC18 Sep 2018
Details of State of the project
S.No. State Name District Name Tehsil Name
(1.)JharkhandPakaurHiranpur
(III) EC Attachments
1 Uploaded PFR (Pre Feasibility Report) File Annexure-PFR file
2 Uploaded Approved Mining Plan File Annexure-Approved Mining Plan file
3 Uploaded District survey report Annexure-District Survey Report
4 Uploaded Cover Letter Annexure-Cover Letter
Uploaded Additional attachments, if any
S.No. Attached File Date of Submission
(1.)FEE_DD18 Sep 2018
(2.)form-118 Sep 2018
(3.)EMP Crusher18 Sep 2018
(4.)certificates/noc18 Sep 2018
(IV) Undertaking
The aforesaid application and documents furnished here with are true to my knowledge.
(IV).(i)
NameDOULATMOMIN
DesignationProprietor
Company DOULATMOMIN
Addressvillage - Rampur PO-PS-Pakur