APPENDIX I | (See Paragraph-6) | FORM 1M | | Note : If space provided against any parameter is inadequate,Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form 1M. Please note that all such Annexures must be part of single pdf document. | (I)Basic Informations | | (i). | Name of the Mining Lease site | Demba Stone Deposit of M/s Amit Kumar Gupta & Vinod Yadav (10.50 Acres) |
| (ii). | Location / site (GPS Co-ordinate) | Latitude- N25°13'36.47" TO N25°13'48.85"
Longitude- E87°35'02.55" TO E87°35'09.66"Annexure-GPS file |
| (iii). | |
Type of Lease | Indivisual Area | Size of the Mining Lease (in ha.) | 4.25 ha. | | | (iv). | Capacity of the Mining Lease (TPA) | 120576 | | (v). | Period of Mining Lease | 10 | | (vi). | Expected cost of the Project | 52 | | (vii). | Have you hired Consultant/Registered Qualified Person(RQP) for preparing document? | Yes | Accreditation No. | 010/87/A | Name of Consultant/RQP | P. K. SEN | Address | RQP/CG-RNC/010/87/A, KALI MANDIR ROAD, PO- DORANDA, RANCHI, JHARKHAND 834002 | Mobile No. | 9431106275 | Landline No. | 2481110 | Email Id | pksenranchi@gmail.com | | | (II) | Environmental Sensitivity | S.No | Areas | Distance in kilometer / Details | | | 1. | (i). Nearest rail or road bridge over the concerned river,rivulet,nallah etc. in kms. | 5.62 km |
| 2. | (ii). Nearest Infrastructural along with distance in kms | 6.19 km | | (iii). Nearest Railway Line along with distance in kms | 2.21 km | | (iv). Nearest National Highway along with distance in kms | 2.45 km | | (v). Nearest State Highway along with distance in kms | 7.68 km | | (vi). Nearest Major District Road along with distance in kms | 7.61 km | | (vii). Nearest Any Other Road along with distance in kms | 0.66 km | | (viii). Nearest Electric transmission line pole or tower distance in kms | 2.46 km | | (ix). Nearest Canal or check dam or reservoirs or lake or ponds distance in kms | 6 km | | (x). Nearest In-take for drinking water pump house distance in kms | 6 km | | (xi). Nearest In-take for Irrigation canal pumps distance in kms | 6 km |
| 3. | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | There is no such thing present within the 5 Km buffer zone of the study area | 4. | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | There is no such site present within the 5 Km buffer zone of the study area. | 5. | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | There is no flora fauna present within the project site.
Sometimes local species like Lizard, Snakes are seen. Bushes of lantana and smooth brome grasses are also seen there. | 6. | Inland, coastal, marine or underground waters | Ganga River is flowing near about 6 km away from the area. | 7. | State, National boundaries | Jharkhand - Bihar State border is present at 10.58 Km away in the western side of the applied area. | 8. | Routes or facilities used by the public for access to recreation or other tourist,pilgrim areas | No tourist or pilgrim area is situated within 500m surrounding the project site. | 9. | Defence installations | No defense installation site is present within 500m surrounding the project site. | 10. | Densely populated or built-up area, distance from nearest human habitation | Siram Chouki Bazar (2.58 Km. approx.) in the North eastern direction. | 11. | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship,community facilities) | The area is having dispensary and local hospital facility available at Sriramchowki is about 2.8 km away from the area, Local educational facility available at Marikuti Primary School is about 2.2 Km away from the area. | 12. | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | Project site doesn’t contain of any such important, high quality or scarce resources. | 13. | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | There is no such area present over there within the 5 km buffer zone of the study area. | 14. | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) | Area falls under Seismic Zone-III, i.e. Moderate damages risk zone. Other natural hazard is not expected because of the location of the project. | 15. | Is proposed mining site located over or near fissure/fracture for ground water recharge? | No |
| 16. | Whether the proposal involves approval or clearance under the following Regulations or Acts namely? | | (a). | The Forest (Conservation) Act,1980? | No | | | (b). | The Wildlife (Protection) Act,1972? | No | | | (c). | The Coastal Regulation Zone (C.R.Z) notification,2011? | No |
| | | | 17. | Is forest land involved (ha)? | No | |
| 18. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No |
|
| 19. | New/Expansion/Modernization | New | Proposal Number | DIA/JH/MIN/14262/2018 | File Number | file no-143/2018 | Date of Apply EC | 31 Mar 2018 |
| |
| Details of State of the project |
---|
S.No. | State Name | District Name | Tehsil Name |
---|
(1.) | Jharkhand | Sahibganj | Mandro | | (IV) | Undertaking | | The aforesaid application and documents furnished here with are true to my knowledge. | (IV).(i) | Name | SENS GEOMIN CONSULTANCY PRIVATE LIMITED | Designation | DIRECTOR | Company | SENS GEOMIN CONSULTANCY PRIVATE LIMITED | Address | KALI MANDIR ROAD, NEAR PUJA TENT SERVICE, PO- DORANDA, RANCHI, JHARKHAND |
| |
|