APPENDIX I | (See Paragraph-6) | FORM 1M | | Note : If space provided against any parameter is inadequate,Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form 1M. Please note that all such Annexures must be part of single pdf document. | (I)Basic Informations | | (i). | Name of the Mining Lease site | Padma Brick clay Mine |
| (ii). | Location / site (GPS Co-ordinate) | Latitude: 24°11'43.57" to 24°12'48.14" N
Longitude: 85°22'22.78" to 85°22'27.40"EAnnexure-GPS file |
| (iii). | |
Type of Lease | Indivisual Area | Size of the Mining Lease (in ha.) | 0.923 ha. | | | (iv). | Capacity of the Mining Lease (TPA) | 2401 | | (v). | Period of Mining Lease | 11 | | (vi). | Expected cost of the Project | 12 | | (vii). | Have you hired Consultant/Registered Qualified Person(RQP) for preparing document? | Yes | Accreditation No. | 1619 | Name of Consultant/RQP | Cognizance Research India Pvt. Ltd. | Address | GT-20, Sector-117, Noida | Mobile No. | 8826207364 | Landline No. | 43534753 | Email Id | subh2enviro@gmail.com | | | (II) | Environmental Sensitivity | S.No | Areas | Distance in kilometer / Details | | | 1. | (i). Nearest rail or road bridge over the concerned river,rivulet,nallah etc. in kms. | 00 km |
| 2. | (ii). Nearest Infrastructural along with distance in kms | Padma, approx. 1.0 k km | | (iii). Nearest Railway Line along with distance in kms | approx. 2.0 km towar km | | (iv). Nearest National Highway along with distance in kms | approx. 1.5 km towar km | | (v). Nearest State Highway along with distance in kms | 00 km | | (vi). Nearest Major District Road along with distance in kms | 00 km | | (vii). Nearest Any Other Road along with distance in kms | approx. 0.6 km towar km | | (viii). Nearest Electric transmission line pole or tower distance in kms | 00 km | | (ix). Nearest Canal or check dam or reservoirs or lake or ponds distance in kms | 00 km | | (x). Nearest In-take for drinking water pump house distance in kms | 00 km | | (xi). Nearest In-take for Irrigation canal pumps distance in kms | 00 km |
| 3. | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | There is no area comes under protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value for which NBWL Clearance is required is falling within study area of the project site. Such area in not found within 500 m from the site. | 4. | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | Hazaribagh National Park, approx. 4.0 Km towards SW direction. | 5. | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | No such area is falling within study area of the project site. | 6. | Inland, coastal, marine or underground waters | No, there is no Inland, coastal, marine or underground waters. | 7. | State, National boundaries | Not within study area of the project site. | 8. | Routes or facilities used by the public for access to recreation or other tourist,pilgrim areas | No such route crossing the mine lease area. | 9. | Defence installations | No, there are no Defense installations within project study area. | 10. | Densely populated or built-up area, distance from nearest human habitation | Padma, approx. 1.0 km towards NNW direction. | 11. | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship,community facilities) | Hospitals, Prathmiki swasthya Kendra, Padma, approx. 1.5 km towards NNW direction.
School, Primary school, Padma, approx. 1.0 km towards NNW direction
places of worship, Shiv mandir, Padma, approx. 1.0 km towards NNW direction
community facilities, Gram Panchayat Bhawan, Padma, approx. 1.0 km towards NNW direction | 12. | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | Nil | 13. | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | There is no such area found within study area from the site | 14. | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) | Area falls under Seismic Zone-III, i.e moderate damage risk zone. Other natural hazard is also not expected because of the geographical location of the project | 15. | Is proposed mining site located over or near fissure/fracture for ground water recharge? | No |
| 16. | Whether the proposal involves approval or clearance under the following Regulations or Acts namely? | | (a). | The Forest (Conservation) Act,1980? | No | | | (b). | The Wildlife (Protection) Act,1972? | No | | | (c). | The Coastal Regulation Zone (C.R.Z) notification,2011? | No |
| | | | 17. | Is forest land involved (ha)? | No | |
| 18. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No |
|
| 19. | New/Expansion/Modernization | New | Proposal Number | DIA/JH/MIN/13536/2018 | File Number | To be assigned | Date of Apply EC | 06 Mar 2018 |
| |
| Details of State of the project |
---|
S.No. | State Name | District Name | Tehsil Name |
---|
(1.) | Jharkhand | Hazaribag | Padma | | (IV) | Undertaking | | The aforesaid application and documents furnished here with are true to my knowledge. | (IV).(i) | Name | BBC BRICKS | Designation | Proprietor | Company | BBC BRICKS | Address | Village - Padma, P.S.- Padma, District- Hazaribag, Jharkhand |
| |
|