APPENDIX I | (See Paragraph-6) | FORM 1M | | Note : If space provided against any parameter is inadequate,Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form 1M. Please note that all such Annexures must be part of single pdf document. | (I)Basic Informations | | (i). | Name of the Mining Lease site | Chuwa Stone Deposit of
M/S Dada Jeetu Buildcon Pvt Ltd |
| (ii). | Location / site (GPS Co-ordinate) | by Longitude 87°34'41.85" E & 87°34'49.60" E and latitude 25°12'33.40” N & 25°12'45.45" NAnnexure-GPS file |
| (iii). | |
Type of Lease | Indivisual Area | Size of the Mining Lease (in ha.) | 3.64 ha. | | | (iv). | Capacity of the Mining Lease (TPA) | 209122.4 | | (v). | Period of Mining Lease | 10 | | (vi). | Expected cost of the Project | 70 | | (vii). | Have you hired Consultant/Registered Qualified Person(RQP) for preparing document? | Yes | Accreditation No. | 30/13/1835 | Name of Consultant/RQP | Ravindra Kumar Prakash | Address | ENVIRON MANTRA CONSULTING CENTER DEEP MANSION KASHYAP VIHAR OPP ASHOK NAGAR GATE NO 4 RANCHI 834002 | Mobile No. | 8757538142 | Landline No. | 6561605 | Email Id | environmantra@gmail.com | | | (II) | Environmental Sensitivity | S.No | Areas | Distance in kilometer / Details | | | 1. | (i). Nearest rail or road bridge over the concerned river,rivulet,nallah etc. in kms. | 8 km |
| 2. | (ii). Nearest Infrastructural along with distance in kms | 4 km | | (iii). Nearest Railway Line along with distance in kms | 8 km | | (iv). Nearest National Highway along with distance in kms | 12 km | | (v). Nearest State Highway along with distance in kms | 12 km | | (vi). Nearest Major District Road along with distance in kms | 4 km | | (vii). Nearest Any Other Road along with distance in kms | 1.5 km | | (viii). Nearest Electric transmission line pole or tower distance in kms | 4 km | | (ix). Nearest Canal or check dam or reservoirs or lake or ponds distance in kms | 10 km | | (x). Nearest In-take for drinking water pump house distance in kms | 15 km | | (xi). Nearest In-take for Irrigation canal pumps distance in kms | 15 km |
| 3. | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | There is no such things within 5 km radius of ML area | 4. | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | The area is more than 500m from the forest and other sensitive area is not within a radius of 5 km. | 5. | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | There is no such area is within 5 km radius of ML area | 6. | Inland, coastal, marine or underground waters | River Ganga is 10 KM from the proposed area | 7. | State, National boundaries | State boundary is more than 10 km from the ML area | 8. | Routes or facilities used by the public for access to recreation or other tourist,pilgrim areas | There is no such important facilitate area within 5 km radius of ML area | 9. | Defence installations | There is a army camp in sahibganj 10 km from the ML area. | 10. | Densely populated or built-up area, distance from nearest human habitation | Mahadevganj is dense populated village 4 km from the ML area. | 11. | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship,community facilities) | There is a hospital 8 km from the applied area, A temple is there 4 km from the ML area | 12. | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | No such important things within 10 km radius of ML area. | 13. | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | No such area within 5 km radius of ML area | 14. | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) | No such area within 10 km radius of ML area. | 15. | Is proposed mining site located over or near fissure/fracture for ground water recharge? | No |
| 16. | Whether the proposal involves approval or clearance under the following Regulations or Acts namely? | | (a). | The Forest (Conservation) Act,1980? | No | | | (b). | The Wildlife (Protection) Act,1972? | No | | | (c). | The Coastal Regulation Zone (C.R.Z) notification,2011? | No |
| | | | 17. | Is forest land involved (ha)? | No | |
| 18. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No |
|
| 19. | New/Expansion/Modernization | New | Proposal Number | DIA/JH/MIN/13126/2018 | File Number | File no.-140/18 | Date of Apply EC | 19 Feb 2018 |
| |
| Details of State of the project |
---|
S.No. | State Name | District Name | Tehsil Name |
---|
(1.) | Jharkhand | Sahibganj | Mandro | | (IV) | Undertaking | | The aforesaid application and documents furnished here with are true to my knowledge. | (IV).(i) | Name | ENVIRON MANTRA CONSULTING CENTER | Designation | Managing Director | Company | ENVIRON MANTRA CONSULTING CENTER | Address | ENVIRON MANTRA CONSULTING CENTER, DEEP MANSION, KASHYAP VIHAR |
| |
|