APPENDIX I
(See Paragraph-6)
FORM 1M
Note : If space provided against any parameter is inadequate,Kindly upload supporting document under 'Additional Attachments if any'  at the last part of the Form 1M. Please note that all such Annexures must be part of single pdf document.
(I)Basic Informations
S.No.Item Details
(i).Name of the Mining Lease site Chengro Stone Mine of M/S SRI LALAN SINGH & SRI DILIP TIWARI 5.09 ACRE
(ii).Location / site (GPS Co-ordinate) The Proposed area is bounded between Latitude N 25°13'16.42" to N 25°13'21.86"& Longitude E 87°42'40.38" to E 87°42'48.10".
Annexure-GPS file      
(iii).
Type of LeaseIndivisual Area
Size of the Mining Lease (in ha.)2.06 ha.
(iv).Capacity of the Mining Lease (TPA) 47427
(v).Period of Mining Lease 7
(vi).Expected cost of the Project 40
(vii).
Have you hired Consultant/Registered Qualified Person(RQP) for preparing document?Yes
Accreditation No.RQPRNC115 
Name of Consultant/RQPSRI SHIVA SHANKAR MAHTO
Address ENVIRON MANTRA CONSULTING CENTER DEEP MANSION KASHYAM VIHAR OPPOSITE ASHOK NAGAR GATE NO 4 RANCHI 834002
Mobile No.8809523505
Landline No.6561605
Email Idenvironmantra@gmail.com
(II) Environmental Sensitivity
S.No Areas Distance in kilometer / Details
1. (i).  Nearest rail or road bridge over the concerned river,rivulet,nallah etc. in kms.  3 km
2. (ii). Nearest Infrastructural along with distance in kms  3 km
(iii). Nearest Railway Line along with distance in kms  3 km
(iv). Nearest National Highway along with distance in kms  8 km
(v). Nearest State Highway along with distance in kms  4 km
(vi). Nearest Major District Road along with distance in kms 3 km
(vii). Nearest Any Other Road along with distance in kms  2 km
(viii). Nearest Electric transmission line pole or tower distance in kms  3 km
(ix). Nearest Canal or check dam or reservoirs or lake or ponds distance in kms  10 km
(x). Nearest In-take for drinking water pump house distance in kms  15 km
(xi). Nearest In-take for Irrigation canal pumps distance in kms  15 km
3. Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
There is nosuch things within the 5 km buffer zone of the study area.
4. Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests There are no areas which are ecologically sensitive within 5 km from the project site.
5. Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration There are no areas which are ecologically sensitive within 5 km from the project site
6. Inland, coastal, marine or underground waters No Inland, coastal, Marine or Underground water source is located within 5 Km from the Mine site.
7. State, National boundaries There is no Interstate/ International boundary falling within 10 km from the project site.
8. Routes or facilities used by the public for access to recreation or other tourist,pilgrim areas No routs area passing through the project site to recreation or other tourist, pilgrim areas.
9. Defence installations No defense installation within 5 km from the mine lease area
10. Densely populated or built-up area, distance from nearest human habitation The nearest habitation is at Chengro which is at a distance of 2.5km from the lease area.
11. Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship,community facilities) Hospital: Sadar Hospital Sahibganj in north direction, distance is around 17 km. School: St. Xaveir School is Situated at Sahibganj town at about 16 km from the area..
12. Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) There are no such areas are falling within 5 km from the project site which contains quality or scarce resources
13. Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) There are no areas already subjected to pollution within 5 km from the project site.
14. Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) No. Although the Area is susceptible to Earthquake as the Project area falls in Zone-III as High Damage Risk Zone. But no natural hazard has caused any
15.
Is proposed mining site located over or near fissure/fracture for ground water recharge?No
16.
Whether the proposal involves approval or clearance under the following Regulations or Acts namely?
(a).
The Forest (Conservation) Act,1980?No
(b).
The Wildlife (Protection) Act,1972?No
(c).
The Coastal Regulation Zone (C.R.Z) notification,2011?No
17.
Is forest land involved (ha)?No
18.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
19.
New/Expansion/ModernizationNew
Proposal NumberDIA/JH/MIN/12206/2018
File Numberfile no.-136/18
Date of Apply EC10 Jan 2018
Details of State of the project
S.No. State Name District Name Tehsil Name
(1.)JharkhandSahibganjTaljhari
(III) EC Attachments
1 Uploaded PFR (Pre Feasibility Report) File Annexure-PFR file
2 Uploaded Approved Mining Plan File Annexure-Approved Mining Plan file
3 Uploaded District survey report Annexure-District Survey Report
4 Uploaded Cover Letter Annexure-Cover Letter
Uploaded Additional attachments, if any
S.No. Attached File Date of Submission
(1.)Hydrogeology Report10 Jan 2018
(IV) Undertaking
The aforesaid application and documents furnished here with are true to my knowledge.
(IV).(i)
NameENVIRON MANTRA CONSULTING CENTER
DesignationManaging Director
Company ENVIRON MANTRA CONSULTING CENTER
AddressENVIRON MANTRA CONSULTING CENTER, DEEP MANSION, KASHYAP VIHAR
Print