APPENDIX I
(See Paragraph-6)
FORM 1M
Note : If space provided against any parameter is inadequate,Kindly upload supporting document under 'Additional Attachments if any'  at the last part of the Form 1M. Please note that all such Annexures must be part of single pdf document.
(I)Basic Informations
S.No.Item Details
(i).Name of the Mining Lease site MURHI STONE DEPOSIT
(ii).Location / site (GPS Co-ordinate) N 23°09’9.41” TO N 23°09’18.73” E 85°18’15.01” TO E 85°18’20.23”
Annexure-GPS file      
(iii).
Type of LeaseIndivisual Area
Size of the Mining Lease (in ha.)2.144 ha.
(iv).Capacity of the Mining Lease (TPA) 137407
(v).Period of Mining Lease 3
(vi).Expected cost of the Project 36
(vii).
Have you hired Consultant/Registered Qualified Person(RQP) for preparing document?Yes
Accreditation No.RQP/162 
Name of Consultant/RQPDR ANAL KUMAR SINHA
Address CHANCHLA SMRITI, PURAN VIHAR, ARGORA BYEPASS ROAD, RANCHI 834002
Mobile No.7762923277
Landline No.2240894
Email Idsinha.anal@rediffmail.com
(II) Environmental Sensitivity
S.No Areas Distance in kilometer / Details
1. (i).  Nearest rail or road bridge over the concerned river,rivulet,nallah etc. in kms.  0.60 km
2. (ii). Nearest Infrastructural along with distance in kms  2.00 km
(iii). Nearest Railway Line along with distance in kms  32 km
(iv). Nearest National Highway along with distance in kms  5 km
(v). Nearest State Highway along with distance in kms  11 km
(vi). Nearest Major District Road along with distance in kms 12 km
(vii). Nearest Any Other Road along with distance in kms  12 km
(viii). Nearest Electric transmission line pole or tower distance in kms  5 km
(ix). Nearest Canal or check dam or reservoirs or lake or ponds distance in kms  5 km
(x). Nearest In-take for drinking water pump house distance in kms  5 km
(xi). Nearest In-take for Irrigation canal pumps distance in kms  5 km
3. Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
There are no areas which are protected within 5 km from the project site.
4. Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests There are no areas which are ecologically sensitive within 5 km from the project site.
5. Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration There are no areas which are ecologically sensitive within 5 km from the project site
6. Inland, coastal, marine or underground waters No Inland, coastal, Marine or Underground water source is located within 5 Km from the Mine site.
7. State, National boundaries There is no Interstate/ International boundary falling within 5 km from the project site.
8. Routes or facilities used by the public for access to recreation or other tourist,pilgrim areas No routs area passing through the project site to recreation or other tourist, pilgrim areas.
9. Defence installations No defense installation within 5 km from the mine lease area
10. Densely populated or built-up area, distance from nearest human habitation The nearest habitation is at Murhi which is at a distance of 2.0 km from the lease area.
11. Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship,community facilities) Hospital: Sadar Hospital, Khunti in north direction, distance is approximately 12 km. School: Govt. Primary School, Belahath at a distance about 3.0 km in NE direction from the area.
12. Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) There are no such areas are falling within 5 km from the project site which contains quality or scarce resources
13. Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) There are no areas already subjected to pollution within 5 km from the project site.
14. Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) No. Although the Area is susceptible to Earthquake as the Project area falls in Zone-III as High Damage Risk Zone. But no natural hazard has caused any Environmental problems till date.
15.
Is proposed mining site located over or near fissure/fracture for ground water recharge?No
16.
Whether the proposal involves approval or clearance under the following Regulations or Acts namely?
(a).
The Forest (Conservation) Act,1980?No
(b).
The Wildlife (Protection) Act,1972?No
(c).
The Coastal Regulation Zone (C.R.Z) notification,2011?No
17.
Is forest land involved (ha)?No
18.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
19.
New/Expansion/ModernizationNew
Proposal NumberDIA/JH/MIN/12121/2018
File NumberXXXVII - 02/2017, VOL. - 4
Date of Apply EC05 Jan 2018
Details of State of the project
S.No. State Name District Name Tehsil Name
(1.)JharkhandKhuntiKhunti
(III) EC Attachments
1 Uploaded PFR (Pre Feasibility Report) File Annexure-PFR file
2 Uploaded Approved Mining Plan File Annexure-Approved Mining Plan file
3 Uploaded District survey report Annexure-District Survey Report
4 Uploaded Cover Letter Annexure-Cover Letter
Uploaded Additional attachments, if any
S.No. Attached File Date of Submission
NIL
(IV) Undertaking
The aforesaid application and documents furnished here with are true to my knowledge.
(IV).(i)
NameV K S INFRASTRUCTURE PVT LTD
DesignationDIRECTOR
Company V K S INFRASTRUCTURE PVT LTD
AddressVILLAGE MURHI THANA KHUNTI DIST KHUNTI JHARKHAND