APPENDIX I | (See Paragraph-6) | FORM 1M | | Note : If space provided against any parameter is inadequate,Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form 1M. Please note that all such Annexures must be part of single pdf document. | (I)Basic Informations | | (i). | Name of the Mining Lease site | M/S ANIL KUMAR GUPTA BRICK EARTH EXCAVATION |
| (ii). | Location / site (GPS Co-ordinate) | Latitude 24° 11' 41.37"N TO 24° 11' 41.08"N
Longitude 84° 04' 57.68"E TO 84°04' 59.81"EAnnexure-GPS file |
| (iii). | |
Type of Lease | Indivisual Area | Size of the Mining Lease (in ha.) | 1.821 ha. | | | (iv). | Capacity of the Mining Lease (TPA) | 3088.8 | | (v). | Period of Mining Lease | 5 | | (vi). | Expected cost of the Project | 20 | | (vii). | Have you hired Consultant/Registered Qualified Person(RQP) for preparing document? | Yes | Accreditation No. | 129/2007/A | Name of Consultant/RQP | SIDDHARTHA RAKSHIT | Address | BAGDU, LOHARDAGA, JHARKHAND | Mobile No. | 8873186862 | Landline No. | 229077 | Email Id | anilkumarguptapalamu@gmail.com | | | (II) | Environmental Sensitivity | S.No | Areas | Distance in kilometer / Details | | | 1. | (i). Nearest rail or road bridge over the concerned river,rivulet,nallah etc. in kms. | 6.20 km |
| 2. | (ii). Nearest Infrastructural along with distance in kms | 18 km | | (iii). Nearest Railway Line along with distance in kms | 8.10 km | | (iv). Nearest National Highway along with distance in kms | 2.75 km | | (v). Nearest State Highway along with distance in kms | 16 km | | (vi). Nearest Major District Road along with distance in kms | 1 km | | (vii). Nearest Any Other Road along with distance in kms | 0.27 km | | (viii). Nearest Electric transmission line pole or tower distance in kms | 00 km | | (ix). Nearest Canal or check dam or reservoirs or lake or ponds distance in kms | 00 km | | (x). Nearest In-take for drinking water pump house distance in kms | 00 km | | (xi). Nearest In-take for Irrigation canal pumps distance in kms | 00 km |
| 3. | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | No,No protected Areas as notified under wildlife (protection) Act-1972 is located in whole or in part within the 15 km boundry of project site. | 4. | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | NA | 5. | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | No,
No protected important or sensitive species of flora and fauna were found | 6. | Inland, coastal, marine or underground waters | None,no such lands found | 7. | State, National boundaries | Bihar State Boundry located 32.10 km N. | 8. | Routes or facilities used by the public for access to recreation or other tourist,pilgrim areas | NH-98 - 2.75 Km West of ML | 9. | Defence installations | None | 10. | Densely populated or built-up area, distance from nearest human habitation | Daltonganj is 18.50 Km north from the ML. | 11. | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship,community facilities) | Daltonganj is 18.50 Km north from the ML. | 12. | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | North Koel River is flowing at a distance of 6.20 Km SW from the proposed excavation site. | 13. | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | NA | 14. | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) | As the site comes under seismic zone II according to Indian Standard Seismic Zone II. Neither any adverse impact of natural hazards has been noted so for at the sites nor it is anticipated. | 15. | Is proposed mining site located over or near fissure/fracture for ground water recharge? | No |
| 16. | Whether the proposal involves approval or clearance under the following Regulations or Acts namely? | | (a). | The Forest (Conservation) Act,1980? | No | | | (b). | The Wildlife (Protection) Act,1972? | No | | | (c). | The Coastal Regulation Zone (C.R.Z) notification,2011? | No |
| | | | 17. | Is forest land involved (ha)? | No | |
| 18. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No |
|
| 19. | New/Expansion/Modernization | New | Proposal Number | DIA/JH/MIN/11906/2017 | File Number | 30/C | Date of Apply EC | 27 Dec 2017 |
| |
| Details of State of the project |
---|
S.No. | State Name | District Name | Tehsil Name |
---|
(1.) | Jharkhand | Palamu | Bishrampur | | (IV) | Undertaking | | The aforesaid application and documents furnished here with are true to my knowledge. | (IV).(i) | Name | MS ANIL KUMAR GUPTA | Designation | OWNER | Company | MS ANIL KUMAR GUPTA | Address | VILLAGE-MURMA, PO-LAMIPATRA, PS-PANDWA, DISTRICT-PALAMU, JHARKHAND |
| |
|