APPENDIX I | (See Paragraph-6) | FORM 1M | | Note : If space provided against any parameter is inadequate,Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form 1M. Please note that all such Annexures must be part of single pdf document. | (I)Basic Informations | | (i). | Name of the Mining Lease site | ASHUTOSH SINGH STONE MINE |
| (ii). | Location / site (GPS Co-ordinate) | latitude - 25°13'52.70? to 25°13'59.68? N
longitude - 87°34'48.75? to 87°34'58.16? EAnnexure-GPS file |
| (iii). | |
Type of Lease | Indivisual Area | Size of the Mining Lease (in ha.) | 3.00 ha. | | | (iv). | Capacity of the Mining Lease (TPA) | 260120.9 | | (v). | Period of Mining Lease | 10 | | (vi). | Expected cost of the Project | 45 | | (vii). | Have you hired Consultant/Registered Qualified Person(RQP) for preparing document? | Yes | Accreditation No. | 143/2009/A | Name of Consultant/RQP | AMARJEET KUMAR SINGH | Address | DHANBAD | Mobile No. | 9431508228 | Landline No. | 03262264 | Email Id | msdhanbad69@gmail.com | | | (II) | Environmental Sensitivity | S.No | Areas | Distance in kilometer / Details | | | 1. | (i). Nearest rail or road bridge over the concerned river,rivulet,nallah etc. in kms. | 10 km |
| 2. | (ii). Nearest Infrastructural along with distance in kms | 10 km | | (iii). Nearest Railway Line along with distance in kms | 10 km | | (iv). Nearest National Highway along with distance in kms | 5 km | | (v). Nearest State Highway along with distance in kms | 5 km | | (vi). Nearest Major District Road along with distance in kms | 5 km | | (vii). Nearest Any Other Road along with distance in kms | 1 km | | (viii). Nearest Electric transmission line pole or tower distance in kms | 0.5 km | | (ix). Nearest Canal or check dam or reservoirs or lake or ponds distance in kms | 0 km | | (x). Nearest In-take for drinking water pump house distance in kms | 0.5 km | | (xi). Nearest In-take for Irrigation canal pumps distance in kms | 0 km |
| 3. | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | No, the areas does not protected
under international conventions,
national or local legislation for their
ecological, landscape, cultural or
other related value | 4. | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | No, the areas are not important or
sensitive for ecological reasons -
Wetlands, watercourses or other
water bodies, coastal zone,
biospheres, mountains, forests | 5. | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | No, the areas do not used by
protected, important or sensitive
species of flora or fauna for
breeding, nesting, foraging, resting,
over wintering, migration | 6. | Inland, coastal, marine or underground waters | There are no inland, coastal, marine
water near mine site However,
underground waters are found
below 25 to 30 m depth. | 7. | State, National boundaries | State boundaries more than 20 Km
Bihar National boundaries - No | 8. | Routes or facilities used by the public for access to recreation or other tourist,pilgrim areas | Public vehicles like jeep, bus etc | 9. | Defence installations | No, Defense installations | 10. | Densely populated or built-up area, distance from nearest human habitation | No, distance from nearest human
habitation 1.0 Km | 11. | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship,community facilities) | No, the areas do not occupied by
any sensitive man-made land uses
(hospitals, schools, places of
worship, community facilities). | 12. | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | No, the areas do not containing any
important, high quality or scarce
resources (ground water resources,
surface resources, forestry,
agriculture, fisheries, tourism,
minerals). | 13. | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | No, the areas do not subject to
pollution or environmental damage.
(those where existing legal
environmental standards are
exceeded) | 14. | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) | No, the areas do not susceptible to
natural hazard which could cause
the project to present environmental
problems (earthquakes,
subsidence, landslides, erosion,
flooding or extreme or adverse
climatic conditions) | 15. | Is proposed mining site located over or near fissure/fracture for ground water recharge? | No |
| 16. | Whether the proposal involves approval or clearance under the following Regulations or Acts namely? | | (a). | The Forest (Conservation) Act,1980? | No | | | (b). | The Wildlife (Protection) Act,1972? | No | | | (c). | The Coastal Regulation Zone (C.R.Z) notification,2011? | No |
| | | | 17. | Is forest land involved (ha)? | No | |
| 18. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No |
|
| 19. | New/Expansion/Modernization | New | Proposal Number | DIA/JH/MIN/11846/2017 | File Number | To be assigned | Date of Apply EC | 23 Dec 2017 |
| |
|