APPENDIX I | (See Paragraph-6) | FORM 1M | | Note : If space provided against any parameter is inadequate,Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form 1M. Please note that all such Annexures must be part of single pdf document. | (I)Basic Informations | | (i). | Name of the Mining Lease site | Mauza Pahlu mining project |
| (ii). | Location / site (GPS Co-ordinate) | 31o 37' 19.05''N
76o 31' 1.47'' EAnnexure-GPS file |
| (iii). | |
Type of Lease | Indivisual Area | Size of the Mining Lease (in ha.) | 4.2795 ha. | | | (iv). | Capacity of the Mining Lease (TPA) | 77040 | | (v). | Period of Mining Lease | 15 | | (vi). | Expected cost of the Project | 8.99 | | (vii). | Have you hired Consultant/Registered Qualified Person(RQP) for preparing document? | No | Reason for not hiring the Consultant/RQP | not required | | | (II) | Environmental Sensitivity | S.No | Areas | Distance in kilometer / Details | | | 1. | (i). Nearest rail or road bridge over the concerned river,rivulet,nallah etc. in kms. | 3 km |
| 2. | (ii). Nearest Infrastructural along with distance in kms | 1.5 km | | (iii). Nearest Railway Line along with distance in kms | 44 km | | (iv). Nearest National Highway along with distance in kms | 8 km | | (v). Nearest State Highway along with distance in kms | 3 km | | (vi). Nearest Major District Road along with distance in kms | 3 km | | (vii). Nearest Any Other Road along with distance in kms | 3 km | | (viii). Nearest Electric transmission line pole or tower distance in kms | 0 km | | (ix). Nearest Canal or check dam or reservoirs or lake or ponds distance in kms | 0 km | | (x). Nearest In-take for drinking water pump house distance in kms | 3 km | | (xi). Nearest In-take for Irrigation canal pumps distance in kms | 0 km |
| 3. | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | none | 4. | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | none | 5. | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | none | 6. | Inland, coastal, marine or underground waters | none | 7. | State, National boundaries | State Boundary:
None, within a radius of
10 Km | 8. | Routes or facilities used by the public for access to recreation or other tourist,pilgrim areas | NH 88 (Shimla-Hamirpur) ˜ 8 Km in South- East | 9. | Defence installations | none | 10. | Densely populated or built-up area, distance from nearest human habitation | Porla:˜ 0.800 Km in West
direction
Ghansui: ˜ 3 Km in South direction
Pahlu: ˜ 1.5 Km in West
direction
Bahal Bhatan˜ 2.5 Km in SE direction
Bairi: ˜ 1.0 Km in East
directions.
Kathla: ˜ 0.500 Km in
West direction. | 11. | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship,community facilities) | Civil Hospital Bhota:
˜ 8 Km in NE direction
Govt. Sr. Sec. School
Jhiralari:˜ 3 Km in SE direction
Krishna Temple Pahlu:
˜1..5 Km in West direction
Balli: ˜ 1.5 Km in South-
West direction(All road
distances) | 12. | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | none | 13. | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | none | 14. | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) | Low probability of earthquake as the area falls in Seismic Zone IV. No landslides or extreme or adverse climatic conditions have been observed in the recent years. | 15. | Is proposed mining site located over or near fissure/fracture for ground water recharge? | No |
| 16. | Whether the proposal involves approval or clearance under the following Regulations or Acts namely? | | (a). | The Forest (Conservation) Act,1980? | No | | | (b). | The Wildlife (Protection) Act,1972? | No | | | (c). | The Coastal Regulation Zone (C.R.Z) notification,2011? | No |
| | | | 17. | Is forest land involved (ha)? | No | |
| 18. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No |
|
| 19. | New/Expansion/Modernization | New | Proposal Number | DIA/HP/MIN/6629/2017 | File Number | DEIAA/MS/EC/6629/2017 | Date of Apply EC | 24 May 2017 |
| |
| Details of State of the project |
---|
S.No. | State Name | District Name | Tehsil Name |
---|
(1.) | Himachal Pradesh | Hamirpur | Barsar(T) | | (IV) | Undertaking | | The aforesaid application and documents furnished here with are true to my knowledge. | (IV).(i) | Name | PAHLU MINING PROJECT | Designation | proponent | Company | PAHLU MINING PROJECT | Address | R/O village and P.O. Bairi, Tehsil Badsar, Distt Hamirpur |
| |
|