APPENDIX I | (See Paragraph-6) | FORM 1M | | Note : If space provided against any parameter is inadequate,Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form 1M. Please note that all such Annexures must be part of single pdf document. | (I)Basic Informations | | (i). | Name of the Mining Lease site | Bangran (khasra No-238/168 and 242/169) Mining Project |
| (ii). | Location / site (GPS Co-ordinate) | 30°29'24"N to 30°29'29"N
77°40'53"E to 77°40'57"EAnnexure-GPS file |
| (iii). | |
Type of Lease | Indivisual Area | Size of the Mining Lease (in ha.) | 1.84 ha. | | | (iv). | Capacity of the Mining Lease (TPA) | 39329 | | (v). | Period of Mining Lease | 5 | | (vi). | Expected cost of the Project | 25 | | (vii). | Have you hired Consultant/Registered Qualified Person(RQP) for preparing document? | Yes | Accreditation No. | 24 | Name of Consultant/RQP | Cognizance Research India Pvt Ltd | Address | GT-20
SECTOR 20 NOIDA | Mobile No. | 9891377760 | Landline No. | 4353753 | Email Id | anilsharmamine@gmail.com | | | (II) | Environmental Sensitivity | S.No | Areas | Distance in kilometer / Details | | | 1. | (i). Nearest rail or road bridge over the concerned river,rivulet,nallah etc. in kms. | |
| 2. | (ii). Nearest Infrastructural along with distance in kms | | | (iii). Nearest Railway Line along with distance in kms | | | (iv). Nearest National Highway along with distance in kms | | | (v). Nearest State Highway along with distance in kms | | | (vi). Nearest Major District Road along with distance in kms | | | (vii). Nearest Any Other Road along with distance in kms | | | (viii). Nearest Electric transmission line pole or tower distance in kms | | | (ix). Nearest Canal or check dam or reservoirs or lake or ponds distance in kms | | | (x). Nearest In-take for drinking water pump house distance in kms | | | (xi). Nearest In-take for Irrigation canal pumps distance in kms | |
| 3. | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | Project Site located on Giri River | 4. | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | Project Site located on Giri River | 5. | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | | 6. | Inland, coastal, marine or underground waters | • Asan conservation Reserve at a distance of 6 km in S direction
• Garib Nath RF : 2 Km in W
• Dada Amboa RF: 4 Km in NE
• Khojar RF: 8 Km in E
• Mehruwala RF: 7.5 Km in NE | 7. | State, National boundaries | Himachal Pradesh & Uttarakhand falls within 10 km) | 8. | Routes or facilities used by the public for access to recreation or other tourist,pilgrim areas | National Highway-NH-72 (6.0 m in S direction)
State Highway-SH-1 (1.0 m in N direction) | 9. | Defence installations | NA | 10. | Densely populated or built-up area, distance from nearest human habitation | Phulpur Shamshergarh: 1 km
Dudhla: 3.5 km
Bangran: 2.5 Km
Kanhu Wala: 5 km
Shivpur: 5 km
Akal Garh: 8 km | 11. | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship,community facilities) | Hospital-• Government Hospital: 3 km
• Lehman Hospital: 9 km
• Siddhivinayak hospital: 9 km
• Paonta sahib Civil Hospital: 9.5 km
• School • Doon Valley International School: 3 km
• Primary School Asharodi: 8 km
• Rose orchid World School: 8 km | 12. | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | Project site located on Giri River
YamunaRiver-05 km in S direction | 13. | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | No | 14. | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) | The mine area lies in seismic zone IV, which is prone to earthquakes. | 15. | | 16. | Whether the proposal involves approval or clearance under the following Regulations or Acts namely? | | (a). | The Forest (Conservation) Act,1980? | | | | (b). | The Wildlife (Protection) Act,1972? | | | | | | | 18. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | |
|
| 19. | New/Expansion/Modernization | New | Proposal Number | DIA/HP/MIN/5733/2017 | File Number | 5 | Date of Apply EC | 03 Apr 2017 |
| |
| Details of State of the project |
---|
S.No. | State Name | District Name | Tehsil Name |
---|
(1.) | Himachal Pradesh | Sirmaur | Paonta Sahib(T) | | (IV) | Undertaking | | The aforesaid application and documents furnished here with are true to my knowledge. | (IV).(i) | Name | ANIL SHARMA | Designation | Owner | Company | ANIL SHARMA | Address | Khasra No.-238/168 and 242/169
Mauza-Bangran
Tehsil-Paonta Sahib
Dist.-Sirmour
State-Himachal Pradesh |
| |
|