APPENDIX I
(See Paragraph-6)
FORM 1M
Note : If space provided against any parameter is inadequate,Kindly upload supporting document under 'Additional Attachments if any'  at the last part of the Form 1M. Please note that all such Annexures must be part of single pdf document.
(I)Basic Informations
S.No.Item Details
(i).Name of the Mining Lease site Mohal Dhar Mining Project
(ii).Location / site (GPS Co-ordinate) 30º 52' 9.63'' N, 77º 10' 33.39'' E
Annexure-GPS file      
(iii).
Type of LeaseIndivisual Area
Size of the Mining Lease (in ha.)1.3704 ha.
(iv).Capacity of the Mining Lease (TPA) 21100
(v).Period of Mining Lease 5
(vi).Expected cost of the Project 8.02
(vii).
Have you hired Consultant/Registered Qualified Person(RQP) for preparing document?No
Reason for not hiring the Consultant/RQP Not required
(II) Environmental Sensitivity
S.No Areas Distance in kilometer / Details
1. (i).  Nearest rail or road bridge over the concerned river,rivulet,nallah etc. in kms.  0 km
2. (ii). Nearest Infrastructural along with distance in kms  0.15 km
(iii). Nearest Railway Line along with distance in kms  16.5 km
(iv). Nearest National Highway along with distance in kms  16.5 km
(v). Nearest State Highway along with distance in kms  3 km
(vi). Nearest Major District Road along with distance in kms 3 km
(vii). Nearest Any Other Road along with distance in kms  0.15 km
(viii). Nearest Electric transmission line pole or tower distance in kms  0 km
(ix). Nearest Canal or check dam or reservoirs or lake or ponds distance in kms  0 km
(x). Nearest In-take for drinking water pump house distance in kms  0 km
(xi). Nearest In-take for Irrigation canal pumps distance in kms  0 km
3. Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
No such area exists near the mining site.
4. Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests None
5. Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration None
6. Inland, coastal, marine or underground waters No such waters exists near the mining site.
7. State, National boundaries StateBoundary : ˜ 56 Km in South-West direction (Road distance).
8. Routes or facilities used by the public for access to recreation or other tourist,pilgrim areas NH 22 (Chandigarh- Shimla): ˜ 16.5 Km in West direction. SH 6 (Solan-Rajgarh road): ˜ 3 Km in South direction.
9. Defence installations Subathu : ˜ 38 Km in S-W direction (By road)
10. Densely populated or built-up area, distance from nearest human habitation Dhar ˜ 2 Km in N-E direction. Anun ˜ 1.5 Km in West direction. Dhako ˜ 1 Km in West direction. Shamror ˜ 1 Km in South direction Garhong ˜ 3 Km in N-W direction (All road distances)
11. Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship,community facilities) 1. Hospital/PHC : Primary Health Centre Ochhghat:˜ 5 Km in S-W 2. School : Govt. Primary School Shamrodh: ˜ 1 Km in S-W direction. 3. Temple : Shree Krishna Mandir Anun ˜ 1.5 Km in West direction 4. Panchayatghar : Shamrodh ˜ 1 Km in South- West direction. (All road distances)
12. Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) None
13. Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) None
14. Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) Probability of earthquake as the area falls in Seismic Zone IV. But no landslides or extreme or adverse climatic conditions have been observed in the recent years.
15.
Is proposed mining site located over or near fissure/fracture for ground water recharge?No
16.
Whether the proposal involves approval or clearance under the following Regulations or Acts namely?
(a).
The Forest (Conservation) Act,1980?No
(b).
The Wildlife (Protection) Act,1972?No
(c).
The Coastal Regulation Zone (C.R.Z) notification,2011?No
17.
Is forest land involved (ha)?No
18.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
19.
New/Expansion/ModernizationNew
Proposal NumberDIA/HP/MIN/14350/2018
File Number24
Date of Apply EC04 Apr 2018
Details of State of the project
S.No. State Name District Name Tehsil Name
(1.)Himachal PradeshSolanSolan(T)
(III) EC Attachments
1 Uploaded PFR (Pre Feasibility Report) File Annexure-PFR file
2 Uploaded Approved Mining Plan File Annexure-Approved Mining Plan file
3 Uploaded District survey report Annexure-District Survey Report
4 Uploaded Cover Letter Annexure-Cover Letter
Uploaded Additional attachments, if any
S.No. Attached File Date of Submission
(1.)Annexure 104 Apr 2018
(2.)Annexure 204 Apr 2018
(3.)Geological maps104 Apr 2018
(4.)Geological maps204 Apr 2018
(5.)Mining Site Photos04 Apr 2018
(IV) Undertaking
The aforesaid application and documents furnished here with are true to my knowledge.
(IV).(i)
NameMOHAN LAL MOHAL DHAR
DesignationProponent
Company MOHAN LAL MOHAL DHAR
AddressM/S Shree Jawala Jee Sand Mine, Village Bawra, P.O. Basal, Tehsil and Distt Solan