APPENDIX I
(See Paragraph-6)
FORM 1M
Note : If space provided against any parameter is inadequate,Kindly upload supporting document under 'Additional Attachments if any'  at the last part of the Form 1M. Please note that all such Annexures must be part of single pdf document.
(I)Basic Informations
S.No.Item Details
(i).Name of the Mining Lease site PARABATBHAI RAJABHAI PATEL”
(ii).Location / site (GPS Co-ordinate) S. No. 122/A in front of Mahisagar, Village: Pali, Tal: Galteshwar, Dist: Kheda, State: Gujarat, India. 22°47'58.95"N 73°21'13.90"E
Annexure-GPS file      
(iii).
Type of LeaseIndivisual Area
Size of the Mining Lease (in ha.)1.0 ha.
(iv).Capacity of the Mining Lease (TPA) 108000
(v).Period of Mining Lease 10
(vi).Expected cost of the Project 2.0
(vii).
Have you hired Consultant/Registered Qualified Person(RQP) for preparing document?No
Reason for not hiring the Consultant/RQP no
(II) Environmental Sensitivity
S.No Areas Distance in kilometer / Details
1. (i).  Nearest rail or road bridge over the concerned river,rivulet,nallah etc. in kms.  1.27 km
2. (ii). Nearest Infrastructural along with distance in kms  1.50 km
(iii). Nearest Railway Line along with distance in kms  1.18 km
(iv). Nearest National Highway along with distance in kms  1.30 km
(v). Nearest State Highway along with distance in kms  1.30 km
(vi). Nearest Major District Road along with distance in kms 1.30 km
(vii). Nearest Any Other Road along with distance in kms  1.30 km
(viii). Nearest Electric transmission line pole or tower distance in kms  1.18 km
(ix). Nearest Canal or check dam or reservoirs or lake or ponds distance in kms  6.12 km
(x). Nearest In-take for drinking water pump house distance in kms  6.12 km
(xi). Nearest In-take for Irrigation canal pumps distance in kms  0.5 km
3. Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
Jambughoda wild life sanctuary:54.60 Km in SE
4. Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Wanakbori Dam: 18 Km in NE
5. Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration no
6. Inland, coastal, marine or underground waters Arabian Sea :122 Km in SW
7. State, National boundaries Madhyapradesh State: 100 Km in E
8. Routes or facilities used by the public for access to recreation or other tourist,pilgrim areas No
9. Defence installations No
10. Densely populated or built-up area, distance from nearest human habitation Sevalia: 1.0 Km in NW
11. Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship,community facilities)
12. Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) Nearest hospital: Sonaba Hospital, : 2.67 km in NW Nearest School: Primary School: 1.00km in NW Nearest population : Sevalia:1 km in NW
13. Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No such scare resources are found.
14. Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) The area has no history of Flooding-Soil Erosion. The area is categorized in the seismic zone III which is classified as having a moderate seismic intensity.
15.
Is proposed mining site located over or near fissure/fracture for ground water recharge?No
16.
Whether the proposal involves approval or clearance under the following Regulations or Acts namely?
(a).
The Forest (Conservation) Act,1980?No
(b).
The Wildlife (Protection) Act,1972?No
(c).
The Coastal Regulation Zone (C.R.Z) notification,2011?No
17.
Is forest land involved (ha)?No
18.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
19.
New/Expansion/ModernizationNew
Proposal NumberDIA/GJ/MIN/5760/2017
File NumberTo be assigned
Date of Apply EC04 Apr 2017
Details of State of the project
S.No. State Name District Name Tehsil Name
(1.)GujaratKhedaThasra
(III) EC Attachments
1 Uploaded PFR (Pre Feasibility Report) File Annexure-PFR file
2 Uploaded Approved Mining Plan File Annexure-Approved Mining Plan file
3 Uploaded District survey report Annexure-District Survey Report
4 Uploaded Cover Letter Annexure-Cover Letter
Uploaded Additional attachments, if any
S.No. Attached File Date of Submission
(1.)Summary04 Apr 2017
(IV) Undertaking
The aforesaid application and documents furnished here with are true to my knowledge.
(IV).(i)
NamePARBAT R PATEL
DesignationProprietor
Company PARBAT R PATEL
AddressM/s. Stone India, Behind Sevalia Railway Station, Village- Pali,
Print