APPENDIX I | (See Paragraph-6) | FORM 1M | | Note : If space provided against any parameter is inadequate,Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form 1M. Please note that all such Annexures must be part of single pdf document. | (I)Basic Informations | | (i). | Name of the Mining Lease site | Dhansuli Limestone Quarry |
| (ii). | Location / site (GPS Co-ordinate) | 21°16'58.15" to 21°16'58.29" 81°45'51.20" to 81°45'54.72"Annexure-GPS file |
| (iii). | |
Type of Lease | Indivisual Area | Size of the Mining Lease (in ha.) | 1.214 ha. | | | (iv). | Capacity of the Mining Lease (TPA) | 25050 | | (v). | Period of Mining Lease | 10 | | (vi). | Expected cost of the Project | 65 | | (vii). | Have you hired Consultant/Registered Qualified Person(RQP) for preparing document? | No | Reason for not hiring the Consultant/RQP | Due to B2 project | | | (II) | Environmental Sensitivity | S.No | Areas | Distance in kilometer / Details | | | 1. | (i). Nearest rail or road bridge over the concerned river,rivulet,nallah etc. in kms. | 5.6 km |
| 2. | (ii). Nearest Infrastructural along with distance in kms | 4.02 km | | (iii). Nearest Railway Line along with distance in kms | 5.5 km | | (iv). Nearest National Highway along with distance in kms | 5.3 km | | (v). Nearest State Highway along with distance in kms | 4.57 km | | (vi). Nearest Major District Road along with distance in kms | 4.57 km | | (vii). Nearest Any Other Road along with distance in kms | 0.49 km | | (viii). Nearest Electric transmission line pole or tower distance in kms | 0.61 km | | (ix). Nearest Canal or check dam or reservoirs or lake or ponds distance in kms | 0.55 km | | (x). Nearest In-take for drinking water pump house distance in kms | 0.59 km | | (xi). Nearest In-take for Irrigation canal pumps distance in kms | 8.12 km |
| 3. | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | No such area are located within 10 km aerial distance from the lease . | 4. | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | No such important or sensitive for ecological reason within 10 km aerial distance from the lease area. | 5. | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | No such area are located within 10 km aerial distance from the lease . | 6. | Inland, coastal, marine or underground waters | Not available in the lease area. | 7. | State, National boundaries | There is no state or national boundaries close within 10 km aerial distance from the lease arae | 8. | Routes or facilities used by the public for access to recreation or other tourist,pilgrim areas | No routes or facilities are available in the lease area within 10 km from the lease area. | 9. | Defence installations | The area is not located close to any of the defence installation. | 10. | Densely populated or built-up area, distance from nearest human habitation | Densly Populated area - Raipur at 13 km and distance from nearest human habitation at Dhansuli at 0.61 km | 11. | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship,community facilities) | Govt. Hospital at 1.2 km | 12. | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | No such area are located within the lease area except ground water resources. | 13. | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | None around 10 km | 14. | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) | The area is safe for any type of dangerous. | 15. | Is proposed mining site located over or near fissure/fracture for ground water recharge? | No |
| 16. | Whether the proposal involves approval or clearance under the following Regulations or Acts namely? | | (a). | The Forest (Conservation) Act,1980? | No | | | (b). | The Wildlife (Protection) Act,1972? | No | | | (c). | The Coastal Regulation Zone (C.R.Z) notification,2011? | No |
| | | | 17. | Is forest land involved (ha)? | No | |
| 18. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No |
|
| 19. | New/Expansion/Modernization | New | Proposal Number | DIA/CG/MIN/3918/2017 | File Number | EC/RAIPUR/QL/105 | Date of Apply EC | 10 Jan 2017 |
| |
| Details of State of the project |
---|
S.No. | State Name | District Name | Tehsil Name |
---|
(1.) | Chhattisgarh | Raipur | Arang | | (IV) | Undertaking | | The aforesaid application and documents furnished here with are true to my knowledge. | (IV).(i) | Name | VIJAY KUMAR PATEL | Designation | Owner | Company | VIJAY KUMAR PATEL | Address | Vill-Dhansuli, Teh- Arang, Dist- Raipur. |
| |
|